Shonga Dam
Illorin, Kwara State, Nigeria
The DUO Formwork was used for the construction of the 250sqm slab area of the Shonga Dam. Other technical details
The total beam length is 88Lm
Clear height under slab =4.25m
Clear height under beam = 3.75m
Location
Main Application
Projects in Nigeria
Project participants
Customer: Construction Products In Nigeria
Project realisation
Impressions from the project process
DUO used for slab shuttering for the constuction of Songa Dam
DUO used for the slab construction of Songa Dam
DUO formwork used in the construction of the songa dam
Use of DUO formwork in the construction of the slab of songa dam
The use of DUO for slab construction in the songa dam
Shonga Dam drawing
Shonga Dam Drawing
Shonga Dam Construction

















DUO used for slab shuttering for the constuction of Songa Dam

DUO used for the slab construction of Songa Dam

DUO formwork used in the construction of the songa dam

Use of DUO formwork in the construction of the slab of songa dam

The use of DUO for slab construction in the songa dam

Shonga Dam drawing

Shonga Dam Drawing

Shonga Dam Construction
Project Information
Are you working on a project like this?
Call us on +234(0)9032325553 for any inquiry.