EPC of OB3 Gas transmission Pipeline system LOT B (67 km x 48-inch), which starts from the Intermediate Pigging station at Umukwata (around KP 63.45) in Delta State and terminates at Oben Node in Edo State
Overview
PERI products and solutions. Build faster when two systems work as one.
Products
Digital Products
Downloads
Outstanding Formwork and Scaffolding Projects.
Reference projects
We are the reliable partner for the whole construction process in all phases of your project.
About Us
Get in Touch