PERI UP Frame Working Scaffold T72,T104: Fast and safe assembly with guardrail in advance.

PERI UP Frame Working Scaffold T 72, T 104

Working Scaffold with guardrails in advance


Integrated safety and fast assembly with guardrail in advance

Load bearing capacity: 
up to Load Class 4 (PERI UP T72)
up to Load Class 6 (PERI UP T104)

With T-frames, facade scaffolding can be assembled quickly and safely by means of the guardrail in advance and self-securing steel decks.

The PERI UP T 72 / T 104 frame scaffold fulfills all scaffolding tasks which can be technically and cost-effectively realized with frame scaffolding. In addition, the system provides the user with an extraordinarily high level of safety which makes the harness protection required in many countries unnecessary. The guardrail in advance for the next level is assembled together with the T-frame from the lower, already secured scaffolding level. The scaffolder is therefore in a safe position when entering the next level. This is the basis for fast and safe working procedures. The high load-bearing capacity of the PERI UP T 72 / T 104 frame scaffold allows large bay sizes for all scaffold groups and the work to be carried out. The standard anchor arrangement for PERI UP follows an 8 m offset pattern. Only PERI UP has received official approval to extend this pattern to the edges of the scaffolding. The high frame stability and load capacity of the T-Frame UVT allows many different variations: inside console brackets on every level, additional outside console brackets, protection roofs, nets and tarpaulins.


Applications at a glance

  • PERI UP Frame Working Scaffold T72,T104: Fast and safe assembly with guardrail in advance.
    Fast and safe assembly with guardrail in advance.
  • PERI UP Rahmen-Arbeitsgerüste T72,T104: The scaffolder can work fast at safe conditions due to the system-integrated fall protection. The guardrail in advance for the next level is assembled together with the T-frame from the lower, already secured scaffolding level. No extra tools are required.
    The scaffolder can work fast at safe conditions due to the system-integrated fall protection. The guardrail in advance for the next level is assembled together with the T-frame from the lower, already secured scaffolding level. No extra tools are required.
  • PERI UP Frame Working Scaffold: Due to the integrated lock against uplift, the deck is secured immediately after being put in place
    Due to the integrated lock against uplift, the deck is secured immediately after being put in place
  • PERI UP Frame Working Scaffold T72,T104: Fast guardrail assembly without additional tools. Integrated fixings for inner guardrail.
    Fast guardrail assembly without additional tools. Integrated fixings for inner guardrail.
  • PERI UP Frame Working Scaffold T72,T104: End guardrails in advance allow fast and safe assembly
    End guardrails in advance allow fast and safe assembly
  • PERI UP Frame Working Scaffold T72,T104: Application example: job site in Ingolstadt, Germany.
    Application example: job site in Ingolstadt, Germany.

Related Products

Interested in the PERI UP Frame Working Scaffold

Call us on +234(0)9032325553 now for all inquiries

You have an inquiry?

Call our experienced Sales Engineers for further information.